β’ Electrical load assessment and calculation
β’ Connected load and demand load analysis
β’ Phase balancing recommendations
β’ Cable and breaker sizing guidance
β’ Future load expansion planning
β’ Load report preparation
β’ Engineer consultation charges
β’ Load analysis and calculation services
β’ Technical evaluation and reporting
β’ Basic documentation and recommendations
β’ Electrical design or installation works
β’ Site modifications or rewiring
β’ Government approvals and statutory submissions
β’ Equipment supply or procurement
β’ βΉ1,000 β βΉ15,000 per site (depending on project size and complexity)
β’ Inspection/Visit Charge: βΉ500 β βΉ2,000 (adjustable if work proceeds)
β’ Final cost depends on load size, project type, and documentation requirements
β’ Customer must provide electrical drawings, connected load details, and site information.
β’ Load calculation is based on provided data and site inspection findings.
β’ Any design changes or modifications are not included unless separately agreed.
β’ Service charges may vary based on project complexity and load requirements.
β’ ELTO is not responsible for incorrect or incomplete data provided by the customer.
β’ Load report and recommendations provided by ELTO shall be considered final for advisory purposes.
β’ Payment must be completed upon service completion unless otherwise agreed.