β’ UPS and inverter installation and setup
β’ Battery connection and wiring
β’ Load connection and distribution
β’ Earthing and safety checks
β’ Functional testing and backup verification
β’ Basic troubleshooting during installation
β’ Technician labor charges
β’ Installation and wiring services
β’ Testing and commissioning
β’ Minor consumables required for service
β’ Cost of UPS, inverter, batteries, cables, and accessories
β’ New wiring or major rewiring works
β’ Civil work (wall cutting, drilling, patching, painting)
β’ Repair of faulty UPS/inverter or batteries
β’ βΉ800 β βΉ3,500 per unit (excluding materials)
β’ Inspection/Visit Charge: βΉ199 (adjustable if work proceeds)
β’ Final cost depends on system capacity, battery setup, and site conditions
β’ Customer must provide safe and clear access to the installation area.
β’ UPS, inverter, batteries, cables, and accessories will be charged separately unless included in quotation.
β’ Additional work identified during inspection will be quoted separately and executed only after customer approval.
β’ Service charges may vary depending on system capacity, load requirements, and installation complexity.
β’ Service scheduling is subject to technician availability and serviceable locations.
β’ ELTO is not responsible for manufacturer defects, battery performance issues, or pre-existing faults.
β’ Inspection findings and final technical assessment will be considered final for execution.
β’ Payment must be completed after service unless otherwise agreed.