β’ PVC, GI, and HDPE conduit installation
β’ Power and control cable laying
β’ Concealed and surface conduit works
β’ Cable routing and dressing
β’ Cable pulling and termination support
β’ Testing and safety verification
β’ Technician labor charges
β’ Conduit installation and cable laying services
β’ Testing and inspection
β’ Minor consumables required for service
β’ Cost of conduits, cables, trays, clamps, and accessories
β’ Civil work (wall cutting, trenching, core cutting, patching, painting) unless specified
β’ Cable termination kits and jointing materials
β’ Additional modifications beyond approved scope
β’ βΉ30 β βΉ150 per meter (excluding materials)
β’ Site Inspection Charge: βΉ500 β βΉ2,000 (adjustable if work proceeds)
β’ Final cost depends on cable size, route length, installation method, and site conditions
β’ Customer must provide safe and clear access to the work area.
β’ Conduits, cables, trays, clamps, and accessories will be charged separately unless included in the quotation.
β’ Civil works, trenching, and restoration activities are not included unless specifically mentioned.
β’ Additional work identified during inspection will be quoted separately and executed only after customer approval.
β’ Service charges may vary based on cable size, route complexity, accessibility, and project requirements.
β’ ELTO is not responsible for pre-existing site conditions, concealed obstacles, or unauthorized modifications.
β’ Inspection findings and final technical assessment will be considered final for execution.
β’ Payment must be completed as per agreed project milestones or service terms.